-
Draining the swimming pool and
beginning to remove old coping.
- Removing the old tile.
-
Saw-cutting the deck to provide
needed spacing from pool beam.
-
Installing”bats” to level the pool, planning
tile and coping installation.
-
Preparing swimming pool “bond beam”
for tile and coping installation.
- Installing brick coping.
- Installing tile.
-
Preparing swimming pool for application
of new surface.
-
Applying the new finish
(plaster or Pebble Tec©.)
- Hand troweling new finish (plaster or pebble)
- Completing installation of new surface.
- Final washing of Pebble