Adam's approach to each pool remodeling project is the same: provide timely communication with the property owner about the sequence of construction, plan ahead for minimal pool "down time", install the finest quality materials by highly-skilled pool artisans, and keep the job site safe and clean. By their very nature, pool renovations can be messy; however, Adam's crews are trained to minimize any problems during the course of construction. Our ultimate objective is your complete satisfaction.

   

1. Draining the pool and beginning to remove old coping. 2. Removing the old tile. 3. Saw-cutting
the deck to provide needed spacing from pool beam.

   

4. Installing"bats" to level the pool, planning tile and coping installation. 5. Preparing pool "bond
beam" for tile and coping installation. 6. Installing brick coping.

   

7. Installing tile. 8. Preparing pool for application of new surface. 9. Applying the new finish
(plaster or Pebble Tec©.)

   

10. Hand troweling new finish (plaster or Pebble Tec©.) 11. Completing installation of Pebble Tec©
surface. 12. Final washing of Pebble Tec© surface (Not required for plaster finish).

click here to view the Swimming Pool Renovation Process in more detail.


Here's another example of the Swimming Pool Renovation Process
:

Before

   


During

   

   

   

   


After

   

   

   

   

 

 

  © Adams Pools 2008 | www.adamspools.com  
Home | About | Services | Project Gallery | Showroom | Testimonials | Contact | Sitemap | Contra Costa Swimming Pool Renovations | Marin Pool Renovation